Part | Contents | Current Condition | Development |
---|---|---|---|
Part 1 |
General Principles |
TCVN11820(Part 1_2017) | To be developed in 2025 |
Part 2 |
Loads and Impacts |
TCVN 11820-2_2017 | To be developed in 2025 |
Part 3 |
Materials |
TCVN 11820-3 | |
Part 4-1 |
Foundations |
TCVN 11820-4-1_2020 | |
Part 4-2 |
Soil Improvement |
TCVN 11820-4-2_2020 | |
Part 5 |
Wharves |
TCVN 11820-5_2021 | |
Part 6 |
Breakwaters |
TCVN 11820-6_2023 | |
Part 7 |
Channels and Basins |
To be developed in 2026-27 | |
Part 8 |
Docks, Locks, Slipway and Shipyard |
To be developed in 2026-27 | |
Part 9 |
Dredging and Reclamation |
TCVN 11820-9_2023 | |
Part 10 |
Other Port Facilities |
To be developed in 2026-27 | |
Part 11 |
Concrete and Reinforced Concrete Structures |
To be developed in 2026-27 |
Part | Contents | Current Condition | Development |
---|---|---|---|
- |
Construction and Acceptance |
TCVN 11859_2017 |
Part | Contents | Current Condition | Development |
---|---|---|---|
- |
Maintenance Requirement |
TCVN 13330_2021 |
Part | Contents | Current Condition | Development |
---|---|---|---|
- |
Design Casebook |
To be developed in 2026-27 | |
- |
Maintenance Manual |
To be developed in 2026-27 |
Phone : +84-(0)24-37683191
+84-(0)912439787
Fax : +84-(0)24-37683058
Email : cuchhvn@vinamarine.gov.vn